Home
Videos uploaded by user “Helmut Oberrisser”
C2089 Sahakol Mae Moh 8 FLSmidth Conveyor System
 
09:10
FLSmidth Conveyor System for Sahakol Equipment Public Company Limited’s Mae Moh Overburden Removal Phase 8 project. Largest conveyor in Thailand. Conveyor System Data: 12 Conveyors Belt Width 2200 mm and 2600 mm. Capacity 27.600 t/h. 12.6 km length. Drop -120 m, Lift +310 m. 40 Conveyor Drives 1750 kW and 2000 kW. Total Weight 10.000 tons. Total installed power 72 MW. 105 km Cables. 1000 Field Devices. 9000 PLC Inputs and Outputs. Milestones: Sahakol-FLSmidth Contract Signing: 18 November 2016 Start of Operation: 1 March 2018 Restart of Operation: 21 June 018 after landslide. Hand Over Ceremony: 2 August 2018 Project Manager: Helmut Oberrisser, FLSmidth Video by Helmut Oberrisser
Views: 791 Helmut Oberrisser
C2089 Sahakol Mae Moh 8   FLSmidth Conveyor System HAND OVER CEREMONY 2 Aug 2018
 
05:19
FLSmidth Conveyor System for Sahakol Equipment Public Company Limited’s Mae Moh Overburden Removal Phase 8 operation. HAND OVER CEREMONY on 2 August 2018. EGAT - Sahakol - FLSmidth. Conveyor System Data: 12 Conveyors Belt Width 2200 mm and 2600 mm. Capacity 27.600 t/h. 12.6 km length. Drop -120 m, Lift +310 m. 40 Conveyor Drives 1750 kW and 2000 kW. Total Weight 10.000 tons. Total installed power 72 MW. 105 km Cables. 1000 Field Devices. 9000 PLC Inputs and Outputs. Milestones: Sahakol-FLSmidth Contract Signing: 18 November 2016 Start of Operation: 1 March 2018 Restart of Operation: 21 June 018 after landslide. Hand Over Ceremony: 2 August 2018 Project Manager: Helmut Oberrisser, FLSmidth Video on behalf of FLSmidth by Nanah Lampang.
Views: 199 Helmut Oberrisser
C2089 Sahakol Mae Moh 8   FLSmidth Conveyor System HAND OVER CEREMONY 2 Aug 2018 long version
 
33:23
FLSmidth Conveyor System for Sahakol Equipment Public Company Limited’s Mae Moh Overburden Removal Phase 8 operation. HAND OVER CEREMONY on 2 August 2018. EGAT - Sahakol - FLSmidth. Conveyor System Data: 12 Conveyors Belt Width 2200 mm and 2600 mm. Capacity 27.600 t/h. 12.6 km length. Drop -120 m, Lift +310 m. 40 Conveyor Drives 1750 kW and 2000 kW. Total Weight 10.000 tons. Total installed power 72 MW. 105 km Cables. 1000 Field Devices. 9000 PLC Inputs and Outputs. Milestones: Sahakol-FLSmidth Contract Signing: 18 November 2016 Start of Operation: 1 March 2018 Restart of Operation: 21 June 018 after landslide. Hand Over Ceremony: 2 August 2018 Project Manager: Helmut Oberrisser, FLSmidth Video on behalf of FLSmidth by Nanah Creative Arts Co. Ltd., Lampang.
Views: 119 Helmut Oberrisser
Waldschenke Zeltweg Maibaumaufstellen 2018
 
09:43
Gasthaus Waldschenke Zeltweg Traditionelles Maibaumaufstellen Maibaum 1.Mai 2018 Steirisches Brauchtum Zeltweg Steiermark Österreich
Views: 34 Helmut Oberrisser

Cyberwire newsletter formats
International sales coordinator cover letter
Mac cosmetics cover letter
Picard s method application letters
Win32 toolbar searchsuite application letters